pic1.fw

Project Lubelskie

A straw-fired biomass power plant with electrical output of 47.7 MWe utilizing 12 hectares of industrially zoned land.

read more btn
pic3.fw

Project tomahawk

A straw-fired biomass CHP plant with electrical output of 23.7 MWe and 10 MWth (30 MWth winter peak).

read more btn

Latest News

  • thumbnail
    GOVERNOR OF TELEMARK, NORWAY VISITING LUBLIN
    12 November 2014
    The Governor of Telemark, Mr. Terje Riis-Johansen have been leading a Norwegian delegation to Lubelskie, Poland in cooperation with the business network of Green Business Norway (GBN). TergoPower executives, Mr. Einar O....
  • thumbnail
    INDEPENDENCE DAY IN POLAND
    11 November 2014
    TergoPower congratulates Poland with the independence day, and wish everyone an enjoyable celebration. Poland's National Independence Day marks the anniversary of the country's independence in 1918. It is celebrated as ...
  • thumbnail
    REDUCING GREENHOUSE GAS EMISSIONS BY AT LEAST 40%
    26 October 2014
    Former Energy Minister of Sweden and Chairman of TergoPower, Mr. Jörgen Andersson says that the world's attention has never been as focused on taking responsibility for the environment as now. Global energy consumption c...

chairman's word

jorgen andersen03

By Mr. Jörgen Andersson
Former Energy Minister of Sweden

Read more


Did you know?

That organic waste (including banana skins) in dumps worldwide generates enough methane to power all Poland's power need?

We are doing something
about it

readmore.fw

Contact us

TergoPower AS
Landstadsgate 27
N-3210 Sandefjord
Norway

T: +47 33 69 80 00
F: +47 33 48 46 81 (fax)
E: info@tergopower.com

TergoPower AS
Rolfsbuktveien 17
N-1364 Fornebu
Norway

T: +47 91 84 54 35
E: info@tergopower.com

TergoPower Lublin Sp. z o.o.
Ul. Krakowskie Przedmieście 19/26
20-002 Lublin
Poland

T: +48 81 533 72 79
E: info@tergopower.com  

TergoPower Biłgoraj Sp. z o.o.
Ul. Krakowskie Przedmieście 19/26
20-002 Lublin
Poland

T: +48 81 533 72 79
E: info@tergopower.com  

 

Copyright © 2013 TergoPower AS. All rights reserved | Disclaimer